Monday, April 18, 2011

Waterfall #6 Tee

The waterfalls on both sides of the dam will be up in running shortly.  During the fall we had to reset the stone slabs which have been shifting over the years. This prevented the water flow from properly going over the waterfall.  Shannon Storey in the photo is doing the final cement work this spring.  The final stage is connecting the waterfall pumps.