Monday, December 3, 2012

#3 Tee Renovation

Here are a few pictures of #3 Tee during and after renovation.

Removing the Austrian Pines behind #3 tee box

Installing the retaining wall
Removing the grass from the tee box and surrounds
Rough grade
Almost at final grade
New irrigation being installed
Laser leveling tee boxes
Brick paver walk path being installed
Cutting pavers to be installed
Walk path pavers finished
Limestone retaining wall finished
New #3 Tees and surrounds grassed