| Removing the Austrian Pines behind #3 tee box |
| Installing the retaining wall |
| Removing the grass from the tee box and surrounds |
| Rough grade |
| Almost at final grade |
| New irrigation being installed |
| Laser leveling tee boxes |
| Brick paver walk path being installed |
| Cutting pavers to be installed |
| Walk path pavers finished |
| Limestone retaining wall finished |
| New #3 Tees and surrounds grassed |