Brick Repair
The brick work in front of the valet area was disturbed last year when we were repairing the ease trough drain system. The roof drain system would back up during significant rainfalls. The drainage system at the front of the club travels underneath the brick work down to the loading dock area. After having the drainage system routed we found that there was a blockage in the drain line under the bricks. We repaired the drain line in the fall and this spring restored the brick work.