There was a significant snowfall that fell on February 1st to February 2nd. Approximately 8-10" of snow with substantial drifting. The maintenance crew worked for 2 days to remove the snow. Snow was removed from the south maintenance building roof to eliminate weight (Photo).
Snow on the greens are substantial 12-16" in most areas on them. The snow on the greens is acting as a good insulater, and ice accumulations at the the greens surface is minimal. The drainage trenches will have the snow removed but the greens will be left alone with snow cover.