The greens complexes on all 18 holes and the putting green have been completed with piping, wiring and sprinkler heads. The new satellite system has also been installed. The project was completed is on time, in budget and the irrigation system has been shut down and blown out for the winter season. The contractor has de-mobilizing and has removed the heavy equipment and the trailers from the parking lot.
In the spring the contractor will return and test the sprinkler heads and adjust the spray patterns for optimal performance. Any settling of the ground affected during installation will be repaired at that time. This winter the greens crew will be simulating the irrigation system operation and developing watering routines. We look forward to using this tool next season to improve water management, which will directly benefit the turf grass and playing features with-in the greens complexes.